Decommissioning scope
Inventory & planning
Asset list reconciled with your CMDB and a step-by-step removal plan.
De-racking & removal
Servers, storage, switches and PDUs de-racked and packed safely.
Data destruction
Drives wiped or shredded on-site or at our facility with certificates.
Cabling & racks
Structured cabling, cable trays, racks and containment removed.
UPS & batteries
UPS systems and battery banks removed and recycled compliantly.
Asset recovery
Reusable equipment valued and bought back to offset costs.

Why businesses choose Ecofusion
- Asset-by-asset reconciliation and reporting
- Data destruction with serial-wise certificates
- Work planned around your downtime windows
- Experienced crew for heavy and sensitive equipment
- Buyback value reduces project cost
- Compliant recycling with Green Certificate
Planning a decommission
Start with an accurate inventory and confirm data backups and migration are complete before any equipment is powered down. Agree which drives will be wiped and which shredded, and whether destruction must happen on-site.
We recommend sharing floor access rules, lift sizes and working-hour restrictions during the survey so the removal plan fits your building.